
Evaluation and development of gas injection systems for wastewater treatment
Clean Water Technology Lab CLEWATEC

Alejandro Parra
Innovation Manager CLEWATEC Innovation Lab
Details
Energy Efficiency
Resource Efficiency
The infrastructure within the flow laboratory of CLEWATEC and HZDR includes several test rigs as well as a biosafety level 2 certified wastewater laboratory for investigations with real activated sludge. Analyses based on e.g. videometry, flow microscopy or image processing algorithms are offered. Two DN 900 columns with a maximum filling height of 4 meters are installed in our wastewater laboratory and equipped with instruments for oxygen transfer and nitrification experiments. The two identical columns enable parallel experiments at similar depths as in real aeration tanks. The infrastructure of the flow laboratory is supplemented by the 14 cubic meter mobile aeration tanks, which can be used as a bypass on real wastewater treatment plants. Like the DN 900 columns, the two identical tanks are suitable for parallel performance tests with maximum comparability.
TRL 9 – Actual system proven in operational environment (established product available)
< 25,000€
High (during one month)
Documents
OnePager_Gas Injection